ShowCIMAMotor Chongqing, Sep 19–22, 2026 — meet us there; free factory-visit hosting for dealers →
Yangtze MotoExportExport & Sourcing · Chongqing

Template · While you order · Updated 2026-09-08

PDI report — sample layout

This is the report a dealer receives for every VIN, alongside the video. The unit below is fictional and the values are illustrative; the layout, points and evidence are exactly what we deliver.

All templates

Sample layout, not a real unit. VIN, readings and video reference are placeholders to show how a completed report reads. Real reports carry the actual VIN, the inspector’s name and a video link per unit.

Pre-delivery inspection report

PO / orderPO-2026-SAMPLEInspection date2026-09-08
ModelNC450-R 450 cc rally / ADVColourWhite / blue
VINLYM…SAMPLE01 (17 digits on real report)Engine no.NC450-A2-0000
Odometer3 kmInspectorName · Yangtze Moto Export
VideoLink to per-VIN video (≈3 min: VIN plate, walk-around, cold start, run, lights, brakes)

18-point checklist

#CheckResultReading / note
1VIN plate and engine number match packing list and spec sheetPassVIN LYM…SAMPLE01 · engine NC450-A2-0000
2Frame, welds, paint and plastics free of defects and damagePassMinor scuff on left panel, replaced
3Fluids: engine oil level and grade, coolant level, brake fluidPassOil 10W-40 to mark; coolant 50/50; DOT4
4Battery voltage and terminals; charging system outputPass12.7 V rest · 14.3 V at 4,000 rpm
5Cold start on electric starter; idle stablePassStarted 1st crank · idle 1,450 rpm
6Engine run 5 min; no abnormal noise, leaks or smokePassNo leaks; fan cut-in at 96 °C
7EFI: no stored fault codes; throttle responsePass0 codes
8Clutch and gearbox through all gears on stand / rollerPass6 gears + neutral
9Chain tension and alignment; sprocketsPass30 mm slack set
10Front and rear brakes: lever/pedal feel, pad clearance, ABS lampPassABS lamp self-test OK
11Wheels: spoke tension, runout, bearings; tyre pressure setPassF 1.8 bar · R 2.0 bar
12Suspension: fork and shock free of leaks; preload per specPass
13Steering: head bearings, lock-to-lock, no notchPass
14Lights, indicators, horn, brake light, instruments, switchesPassAll functions
15Fasteners: torque check on axles, sprocket, calipers, barsPassAxle 70 Nm marked
16Accessories per order fitted (road kit, luggage, guards)PassRoad-legal kit fitted
17Documents in crate: spec sheet, manual, keys ×2, tool kitPassKeys 2 · tools 1 set
18Transport prep: battery disconnected, fuel to transport level, crate markingPassFuel 1 L · crate PO-2026-SAMPLE

Result

Overall☑ Released for crating ☐ Hold — rework required ☐ Rejected
Rework performedLeft side panel replaced (point 2); re-inspected and passed
Inspector signature

What pass and fail mean for each point is explained on the PDI checklist page. Dealers repeat points 3–15 at destination using the arrival checklist; the two reports together are the evidence base for any transit-damage or warranty claim.

Free to use and adapt. Provided as a working layout, not legal advice; have your own counsel review contract clauses for your jurisdiction. Yangtze Moto Export, Chongqing, China.

WhatsApp